24 Chaka Industrial Explosion-Proof Manufacturer

+86-15957194752 aurorachen@shenhai-ex.com

SpecificationforAssemblyofExplosion-ProofElectricalEquipment|Zofunika zaukadaulo

Mfundo Zaukadaulo

Kufotokozera kwa Assembly of Explosion-Proof Electrical Equipment

1. Kutengera chithunzi cha kapangidwe kazinthu (kujambula msonkhano wonse), gawani mankhwalawo mu mayunitsi ophatikiza (zigawo, misonkhano yaying'ono, ndi magawo) ndikukhazikitsa njira zolumikizirana zofananira.

zida zamagetsi zomwe sizingaphulike-3
2. Gwirani ndondomeko ya msonkhano pa chigawo chilichonse ndi gawo.

3. Khazikitsani ndondomeko zomveka bwino zoyendetsera msonkhano, fotokozani njira zoyendera, and determine appropriate inspection methods.

4. Choose the appropriate tools and lifting devices needed for the assembly process.

5. Decide on the methods for transferring parts and required tools.

6. Calculate the standard assembly time, excluding the time taken for the transportation of parts.

Zam'mbuyo:

Ena:

Pezani Mawu ?