24 Matahiti 2012

+86-15957194752 aurorachen@shenhai-ex.com

WhatShouldBeNotedfortheWiringofExplosion-ProofLightingDistributionBox|InstallationMethod

Te ravea no te hamani i te mau tauihaa

Eaha te mea e ti'a ia tapa'ohia no te opereraa i te mau tauihaa i roto i te afata opereraa

1. Te faanahoraa o te afata opereraa mori: Te mau nota, tei roto i te reira te hoê pitopito rahi e te numera o te mau amaa.

Te mau parau pia i roto i te ve'a
2. Tu'atiraa i te mana: Ua taaihia te puai o te uira i te pae o te pitopito matamua.

3. Te mau tauiraa i roto i te amaa: All branch switches are connected in parallel to the load side of the main switch.

4. Branch Load Connection: Each branch switch is connected to its respective load.

5. Te mau mana'o tauturu no te: The wiring should be firm and reliable.

Hou te tahuti nei:

I muri iho:

A imi i te hoê faahitiraa parau ?